Forum Discussion

p_bremm11's avatar
p_bremm11
Contributor
10 years ago

After updating my TestComplete 11 my test doubled the runtime

My system: 8GB DDR3 1600Mhz's, i7 - 4790 3.6 Ghz. Windows 7 SP1 x64.

 

Below I put the test code that are having trouble.

 

The test is the test-TC9-TC11.txt file.

 

The log version of TestComplete 9 is attached: versionTC9.mht;
The log version of Tescomplete 11 is attached: versionTC11.mht;

 

  • Files with the description of the test execution duration: CT_2_5117-timeTC9. CT_2_5117-timeTC11.

  • In the code which is bold it is where the problem exists, ie before took the test 50 will be 60 seconds. 90 will now 120 seconds.

  • I am totally disappointed with TestComplete 11 as it needs to compare versions of Delphi 2007 and Delphi xe8 with this problem eventually I lost time.

  • Would there will be a fix for this? I found other posts complaining about something.
  • I do not know if you were all given this issue. But here the total time of all tests end up bringing damage.


If anyone knows any extra configuration that TestComplete 11, please.
 
 
 
Thank you.
Patrick Bremm

 

  • After more than three days looking for the culprit. I found that I should update my dll in my application, tested application. E solved the problem. So if you have problem like it can be something.
     
    In short solution: Update DLLs.