Fennek
15 years agoOccasional Contributor
Black screen with distributed testing
Hi,
I`m sometimes encountering a problem with distributed testing and wanted to know if someone knows this problem too or why this could happen:
We are using the distributed testing functionality of TC a lot and sometimes over a longer period of playback, for example at a regression playback of several hours over night, the window in the NetworkSuite tab of TestComplete where you can follow the playback at the remote PC becomes completely black and the test doesn`t go on with playback. But TC still says that the test is running.
In the morning when I stop the test manually I can see that TC hanged several hours in this state.
This doesn`t happen often, so I can`t tell why this could happen.
First I thought maybe someone logged into the remote PC but we tried that and the behaviour of TC is different when someone does that.
The remote PC also wasn`t restarted as I can still see the tested application when I log into the remote PC myself.
We are using TC 8.20, the remote PC has Win XP (One is a VM, another one is a physical PC), the PC where we start the distributed test has Win 7.
Any ideas?
Thanks
Andreas
I`m sometimes encountering a problem with distributed testing and wanted to know if someone knows this problem too or why this could happen:
We are using the distributed testing functionality of TC a lot and sometimes over a longer period of playback, for example at a regression playback of several hours over night, the window in the NetworkSuite tab of TestComplete where you can follow the playback at the remote PC becomes completely black and the test doesn`t go on with playback. But TC still says that the test is running.
In the morning when I stop the test manually I can see that TC hanged several hours in this state.
This doesn`t happen often, so I can`t tell why this could happen.
First I thought maybe someone logged into the remote PC but we tried that and the behaviour of TC is different when someone does that.
The remote PC also wasn`t restarted as I can still see the tested application when I log into the remote PC myself.
We are using TC 8.20, the remote PC has Win XP (One is a VM, another one is a physical PC), the PC where we start the distributed test has Win 7.
Any ideas?
Thanks
Andreas