Use dynamic parameters for TestItem
Hey, I would like to structure my test sequence via TestItems in TestComplete. But I ran into one problem: I want to start my TestItems (TI) out of the script with dynamic/changing parameters. Is this possible? I could not figure out, how to hand over a variable to the TI. Thank you for your help.Solved1.3KViews0likes1CommentA Skip Function or Button
I understand that 'ideally' no one is watching their tests as they run, but unfortunately that is what I have to do with my company. Our site performance can get slower/faster as the day goes by, so I have a lot of Wait commands in my scripts that I would like to be able to skip during the testshould I need to when our system is running exceptionally2.7KViews0likes1CommentIs there any kind of functionality to skip test items/unnecessary waits (I.e. Alt+Right/Ctrl+Right)?
My company only uses one license for TestComplete that I watch over and since I already am watching the tests I was wondering if there was any functionalitywith TestComplete (I.e. a shortcut command, Dedicated button, or option) that would allow me to skip test steps without adding extra code? (Unfortunately I know very little in terms for/with coding)I ask because sometimes our site runs slower thanusual, usually after posts and it has effected my testing, I had to input a bunch of wait commands (which is great, but not always needed on each page) but I cannot tell ahead of time when ill need to disable/enable them to smoothen test times. If anyone knows a simple command or way to skip test items or an unneeded wait, any assistance/knowledge would be greatly appreciated.4.6KViews0likes4Comments