Forum Discussion
palmerbw
Occasional Contributor
I do not want to use 1 Cycle. I want to use one cycle for the duration of the cycle and then have it create another cycle for that same duration. I.E. a new cycle for each sprint.
prashant-sb
4 years agoStaff
The plugin doesn't have this behavior.
You will have to manually change cycle after each period of time.
You might be able to simulate this behavior if you use pipeline script and calculate whether a new cycle should be created or old one should be used.
I haven't tried this myself so you will need to check whether it' a viable solution.