Ask a Question

How to add execution duration at scenario level in cucumber reports

AdithyaS
Occasional Visitor

How to add execution duration at scenario level in cucumber reports

Hi, If you look at the HTML report per the screenshot below, the scenario has different steps and contains the execution duration at each step. Similarly, how can I add the total execution duration of that scenario at the scenario level ??

0 REPLIES 0
cancel
Showing results for 
Search instead for 
Did you mean: