KCarper
4 years agoOccasional Contributor
Copying a project
I want to use the same basic project with the same variables throughout all my projects. If i copy C:\BASE\2A\z1.pjs to C:\BASE\2B\z1.pjs I need it two switch from 2A to 2B without all the error messages, since all the folders will be the same. Since it seems to be hardcoded to C:\BASE\2A, can I edit one of the files changing 2A to 2B before I run TestComplete?