Ramp/Ramp Seq generators
Hi,
When using the ramp or ramp sequence generator, how do we control the total length of the test run in the VU? The ramp generator has the period setting that seems to control the length of the test. How it works with the total length of the run limit from the project level? If the run limit changes, say from 1 hour to 10 hours, do I have to go to individual VUS to change the period setting for the ramp generator? Any suggestions?
Thanks,
John
When using the ramp or ramp sequence generator, how do we control the total length of the test run in the VU? The ramp generator has the period setting that seems to control the length of the test. How it works with the total length of the run limit from the project level? If the run limit changes, say from 1 hour to 10 hours, do I have to go to individual VUS to change the period setting for the ramp generator? Any suggestions?
Thanks,