Is there any specific setting that we should configure before the synchronization?
No, you just need to walk through the whole mapping procedure and click DONE.
Is there a one way sync possible?
No, the synchronization works in two ways.
I recommend that you check the mapping settings once again - maybe you didn't map some required fields which are required in Jira. Note that, currently, QAC integration page doesn't show all required fields in Jira. To know the required fields in Jira, please open the corresponding Jira project and click the Create button on the top toolbar. The required fields are marked with the asterisk.
If you configure the synchronization as described in this article: Configure Basic Field Mapping and check all required fields in Jira, but the synchronization still doesn't work, please open a new support case: https://support.smartbear.com/message/?prod=qacomplete.
To help us assist you better, please provide the following info:
- Let us know the JIRA edition (Cloud or Server) and the version you're using.
- A version of the QAC Jira plugin installed.
- A screenshot of the QAComplete - JIRA Field Mapping screen.
If you use QAC SaaS, please also let us know the following:
- when approximately you faced the issue last time (the time, date and time zone);
- Jira key(s) or QAC id(s) of the problematic items.