ContributionsMost RecentMost LikesSolutionsMultiple Tabs I need your input concerning opening multiple tabs. Some of my team members open more than one tab in the same browser to access Zephyr. This allows them to switch quickly between different test cases for different devices by clicking on the tab. Since the user has more than one tab open in Zephyr and updating different test cases will this be a problem? The tabs should have different session ID and it should not be an issue, correct?. I'm asking because Zephyr is giving theses members of my team errors during the day. Zephyr squad reporting with Enterprise data Does anyone have steps to use Zephyr Squad reporting with data from Enterprise? We have Enterprise data connecting into our Jira instance, but would like to use the squad reporting features. Is this possible? How to unmap requirements Does anyone have steps to unmap requirements from test cases without deleting either the requirement or the test case? Re: Zephyr Enterprise Dashboard integration I would also love an answer to this Transaction Rolled back error I have a user experiencing some trouble while Syncing. From Test Planning. The user is having trouble with specific folder. The user has informed me they have renamed and removed some test cases. Any ideas how I can advise the user to fix the error? Re: Sync between Test Planning and Test Execution We found the tests needed to be assigned to show up in test execution. Sync between Test Planning and Test Execution I am having trouble with the sync from test planning to test execution. Some of the test cases in test planning are not seen in Test execution. Reports are not showing the test cases SolvedMapping lost Users are reporting missing mappings on requirements previously mapped to test cases. What could be going wrong? Solved