CByler
8 years agoContributor
Set Project Level Variable for Current Date
Question (see attached screenshot)
I have various date formats that I test with each day. I have variables with those formats set at the Project Level. However, doing it in this manner requires that I must manually change the dates each day. Is there a way for me to type in a specific variable such as @Today or @Tomorrow, so that I don't have to manually change these each day? I would need them for today, tomorrow, dates with hyphens vs forward slashes, and one with the current timestamp. Any help is greatly appreciated :)