How would I do this below? Wouldn't this required coping over all exisitng key-word tests from project A and B into project C?
Create Project C and call all scrpts of project A and B within C
Arrange scripts however you like
Run project C
nishantna
10 years agoOccasional Contributor
Go to the Workspace level and approach both projects using groovy. After that get to the desired test steps of each project and then use run(StringToObjectMap properties,boolean async) on the desired test steps , where keep 'async' as false.