Forum Discussion
jr348
12 months agoContributor
The only way I can reproduce that is by canceling the job myself. Is there a someone else who could have cancelled it?
How was build job triggered a schedule, CI/CD code changes? I remember seeing something similar when a time limit was added to a build job, or a certain number of failures.