Forum Discussion
AndyHughes
15 years agoRegular Contributor
Could I use an interval scheduler?
If I set the duration of the scheduler to be infinite then will this run the test case until the test case ends? (The test case itself has a time limit)
I could then set each test running 5 mins after the previous one and hopefully only one will be running at once.
This is still a lot of initial work though to get 400 test scheduled.
Or is there any way of using the same LoadUI test and changing the SOAPUI test case in the SOAPUI runner once the test has completed (after 3 mins) and getting it to cycle through all 400 SOAPUI test cases.
If I set the duration of the scheduler to be infinite then will this run the test case until the test case ends? (The test case itself has a time limit)
I could then set each test running 5 mins after the previous one and hopefully only one will be running at once.
This is still a lot of initial work though to get 400 test scheduled.
Or is there any way of using the same LoadUI test and changing the SOAPUI test case in the SOAPUI runner once the test has completed (after 3 mins) and getting it to cycle through all 400 SOAPUI test cases.