Not sure if this is really related to maven. And no voice in maven.
One of the way is to analyze the test result and disable those tests in the soapui project at the end of the execution of the test. Then re-run the project.
Assuming that each test is independant.
One of the way is to analyze the test result and disable those tests in the soapui project at the end of the execution of the test. Then re-run the project.
Assuming that each test is independant.