Kmeier
2 years agoOccasional Visitor
Spike Testing
Hi! I am looking to initiate a load test and spiking the amount of load throughout the test. For example I would start the test with 10 VUs and then 10 minutes into the test ramp up to 30 VUs for 5 minutes then bring it back down to 10 VUs and do this throughout a 60 minute test. Is this possible with Load Ninja? I have read through documentation and looked through the setting of the tests and do not see this.
Thanks in advance for any help!