Forum Discussion

Kmeier's avatar
Kmeier
Occasional Visitor
2 years ago

Spike Testing

Hi!  I am looking to initiate a load test and spiking the amount of load throughout the test.  For example I would start the test with 10 VUs and then 10 minutes into the test ramp up to 30 VUs for 5 minutes then bring it back down to 10 VUs and do this throughout a 60 minute test.  Is this possible with Load Ninja?  I have read through documentation and looked through the setting of the tests and do not see this.

 

Thanks in advance for any help!

 

 

  • LoadNinja does provide the option for ramping up the number of virtual users (VUs) during a load test, but itdoes not have an automated feature to ramp down the VUs.