MegO
8 years agoContributor
Refer to test results from within a test
Hi,
I am looking for a way for my tests to write out test results automatically to test rail.
I have successfully set up the test rail integration, the problem is that the script to write to testrail will only run if I specify the status id.
I want the the script to be able to pick up the status from test complete, else this is pretty pointless.
My thoughts were to have a test 'test a', which is the test I want to run, and a 'test b' will read the logs from 'test a' and write the results to testrail.
Has anybody got any advice on this or maybe a better way of doing it? it does seem a bit long winded to do this for all my test cases.
Thanks in advance,
Meg